Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/plugins/revslider/includes/operations.class.php on line 2758

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/plugins/revslider/includes/operations.class.php on line 2762

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/plugins/revslider/includes/output.class.php on line 3706

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 751

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 795

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 831

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 839

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 893

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 917

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/gumatane/public_html/abengineeringsofia.com/wp-content/themes/porto/inc/admin/ReduxCore/inc/extensions/customizer/extension_customizer.php on line 955
“Biona Gas” Ltd – AB Engineering Sofia

“Biona Gas” Ltd

  • 1
  • 09.02.2018
Project Description

1. PROJECT: Еlectrical power plan 1.5MW, operating through indirect use of biomass from plant and animal substances, with combined production of electricity and heat. Surveyed І-211, electric and thermal energy in Calapitsa village, Rhodope municipality.

CONSIGNOR: ”Biona Gas” Ltd.

2. PROJECT: Processing during the construction of sheds and warehouses for silage in the Еlectrical power plan 1.5MW for the production of energy with combined cycle and indirect use of biomass, of which the total weight of animal manure is not less than 50 percent, and service buildings in Surveyed 000556 – for a greenhouse, a cow farm, and a biogas plant with a capacity of 1.5MW, Surveyed 000654, Chernozem village, Kaloyanovo municipality, Plovdiv Region.

CONSIGNOR: “ Terra Wine  Chernozem ” Ltd.

3. PROJECT: Change during the construction of “Biomass power plant with power up to 5000 kW to a biomass power plant with power up to 1500 kW” with identifier 56784.101.71. Surveyed 101.71 – Public services, production, and warehousing activities, Skobelitsa locality, Plovdiv-Trakia area, Plovdiv.

CONSIGNOR: “Rhodope Energy” Ltd.

4. PROJECT: Power plant with an internal combustion engine powered by biogas with connection to the electricity distribution network of ENERGO-PRO Networks AD Reconstruction of the outlet cell “Gesha”, in ZRU 20 kW at substation 110/20/10 kV “Gabrovo”, in connection with a change in the conditions for connection of the 20 kV overhead line “Gesha”.

CONSIGNOR: “ELVI” Ltd.

5. PROJECT: Electric power plant operating through indirect use of biomass from plant and animal substances, with combined production of electricity and heat, located Surveyed -XV-510005, Ruptsi village, Cherven Bryag municipality, Pleven region.

CONSIGNOR: “GreenCo R” Ltd.

6. PROJECT: 1.5 MW biogas electric power plant with combined production of electricity and heat, through indirect use of biomass, of which the total weight of animal manure is not less than 60 percent, in Surveyed  V-056014,  56 sq/m, Kula village, “Dobravata” region.

CONSIGNOR: “GreenCo Kula” Ltd.